ዜና እና ክስተት
የአሁኑ ሥፍራ: ቤት » ዜና » Projects » Zhongjie era Steel Structure Frame Overpass Project

Zhongjie era Steel Structure Frame Overpass Project

የተለጠፈው: 2021-10-26     ምንጭ: ይህ ጣቢያ

Introduction of Zhongjie era Steel Structure Frame Overpass Project 


Zhongjie Times Square overpass project is the first Cross Street overpass project in Pingdu. The whole project is composed of three overpasses. The length of the straight overpass on the east side is 56.3 meters and the width is 5 meters. The length of the straight overpass on the west side is 49 meters and the width is 5 meters. The diameter of the main bridge surface of the central circular overpass is 56 meters. The narrowest part is 6.5 meters and the maximum width is 12 meters. The construction of the overpass on Hongqi Road can avoid the interference of people and vehicles To improve the road capacity, and effectively solve the problem of efficiency and safety of a large number of people crossing the street.

After completion, it will become the most characteristic commercial block with urban flavor in the main urban area of Pingdu City, as well as the landscape landmark and cultural landmark of Pingdu.




ከ 1997 ጀምሮ

ስለ እኛ
Qingdao oxuguanguline የአረብ ብረት አሠራር, እ.ኤ.አ. በ 1997 የተመደበው በሰሜን ቻይና ውስጥ ከሚገኙት መሪ የአረብ ብረት አወቃቀር ኩባንያዎች አንዱ ነው.
አግኙን

አግኙን

/sitemap.htmlCopyright © 2021 Qingdao Xinguangzheng Steel Structure Co., Ltd. All Rights Reserved.  Support Leadong | Sitemap